corrosion- and dress in-resistant coiled tubing injector roller chain assemblies for the oil and gasoline industries. Offered in single and double pitch travel chain varieties with various sizes and electrical power rating. Features consist of zinc-nickel and non-hexavalent chromate protecting exterior coating, electrochemically bonded, and interference match include plates.Sophisticated thermo therapy gear, such as community heat therapy oven, multi-use thermo treatment method oven, and many others.
Overview
Fast Information
- ConditWe warmly welcome the buddies from all the world!ion:
-
New
About EPG Team Divisions Fashioned in 1966, Shen represents an amazing checklist of internationally respected organizations and manufactures beneath licence to a variety of these businesses. We also manufacture a variety of merchandise and tools designed and designed by our very own engineers. In 1990 an personnel owner team was fashioned and obtained 50% of the business from co-founder Mike Shen . These shareholders span a varied segment of the firm and underwrite the efficient operate of the EPG Team.
- Warranty:
-
one.5 years
- After Warranty Support:
-
Video specialized assist
- Local Service Location:
-
Egypt
- Showroom Area:
-
Egypt
- Kind:
-
areas
- Manufacturer Identify:
-
OEM
- Place of Origin:Zhejiang, China
- Strain:
-
hydraulic force
- Composition:
-
hydraulic system
- Certification:
-
CE
- Weight:
-
≤280kg, thirty-280kg
- After-income Service Presented:
-
Online video technical help
Source Capacity
- Supply Capability:
- 3000 Piece/Parts per Month
Packaging & Shipping and delivery
- Packaging Particulars
- packaged in plywood scenario or PALLET
- Port
- NINGBO/SHANGHAI, CHINA
-
Guide Time
: -
Amount(Luggage) one – twenty The EP Line PTO travel shafts are recognizable due to the fact of the EP Line patented coupling mechanism and the flexible cone. The PTO travel shafts are distinguished by way of user-friendliness, compactness and appealing design.
>20 Est. Time(times) 15 To be negotiated
On the internet Customization
OEM | yes |
Lead Time | five-20 working days for less than 1500pcs |
Payment | L/C,T/T,D/A,D/P,Western Union |
30% advance payment,the balance paid before shipment | |
Packing | Motor each have their own carton,the outer packing is a five-layer plywood boxes |
Shipping | 1)By air or sea or combined transportation |
two)Express:TNT,FEDEX,UPS,DHL |